What Are the Differences Between a Truck Crane and a Crawler Crane
Column: NEWS Release Time: 2025.02.26

A truck crane is mobile, traveling up to 60 mph on paved roads, with lifting capacities ranging from 10 to 300 tons. It’s ideal for fast site transitions. In contrast, a crawler crane moves at 1-2 mph but can lift up to 1,600 tons on rough terrain, offering superior stability, especially in soft or uneven ground.

Mobility vs. Stability

The areas where most striking differences can be shown and told between truck cranes and crawler cranes relate to questions of mobility and stability, two factors that have an instrumental impact on their job performance and project applicability. A truck crane is a real master of fast mobility-on the road, it is capable of traveling up to 60 miles per hour-and is, therefore, a favorite for projects at which fast transportation between sites is required. The capacities of truck cranes are varied from 10 to 300 tons, depending on the model type and how the machine is configured. By contrast, crawler cranes are slower in action but keep stability at about 1 or 2 miles per hour at maximum speed across rough terrain surfaces. But what makes them special is their lifting capability of up to 1,600 tons, making them ideal for enormous lifting jobs, such as assembling offshore oil rigs or lifting large structural components in construction.

The mobility of truck cranes is enabled by their way of managing to make their way onto roadways without additional transport logistics. For example, a 250-ton truck crane can drive as fast as 50 miles per hour without disassembly and special permits, reducing project transports cost up to 30% compared to crawler cranes which require hauling trailers separately. However, truck cranes are best used in relatively stable environments. Where site conditions are bad, the site may not have enough stability even to support loads and can easily tip over. The stability of a truck crane is mostly dependent on load distribution and location; it's usually more critical on soft and uneven ground. And this is where crawler cranes have their biggest advantage.

Built for performance, crawler cranes perform optimally on heavy ground surfaces because of their wide-track design that helps in minimizing ground pressure. For example, 500-ton crawler cranes lift gigantic components with accuracy on sites built on soft and marshy areas where truck cranes cannot operate with efficiency. This is a very high degree of stability, especially for those projects dealing in dam constructions or huge infrastructure projects where cranes need to work on soft or slopping surfaces and hold heavy loads for longer periods. It is because of such stabilities that crawler cranes are able to carry 25% to 40% more weight than a similarly sized truck crane on soft or slopping ground without setting or tipping over.

In terms of maintenance costs, truck cranes are cheaper in the long run if the nature of the work involves frequent traveling between metalled roads. On the other hand, crawler cranes require more intensive maintenance due to their design. For example, crawler crane undercarriages are always in contact with dirt and undergo wear and tear; the track systems have to be replaced every 2 to 3 years, depending upon usage. This raises the maintenance budget by as high as 20% to 30% compared to truck cranes. For projects requiring stability over long periods, this added expense is well worth it.

Another aspect involves the time efficiency in mobilization. Truck cranes can often be up and running within 30 to 60 minutes after arrival, allowing them to begin work without delay. Whereas, crawler cranes take as long as 2 hours for proper on-site setup, especially in cases where the ground requires extra preparation or levelling. The delay in set-up time will have a remarkable impact on the timeline of the project, particularly for those short-term and fast-paced jobs. For example, on a recent high-rise project, the mobilization time differential between a truck crane and a crawler crane reduced project efficiency by 7% when crawler cranes were mobilized for quick picks between building stages.

Setup Time Comparison

When comparing setup times between truck cranes and crawler cranes, each seems suited to the particular demands of a project because of their respective strengths and weaknesses. For example, a setup of a truck crane usually takes less time compared to a crawler crane. Whereas a 250-ton truck crane can be operational in as little as 30 to 60 minutes after arriving on the job site, a 500-ton crawler may take up to 2 hours to rig just the basic unit, considering the time needed for site preparation and adjustments to the undercarriage. This can have a great effect on the overall project timeline, especially when repositioning or fast turnaround times are crucial. For example, on a recent job site in Chicago, 3 days of labor were saved when it came to construction simply because of the option of using a truck crane rather than a crawler due to their faster setup.

This is in part because of how much faster it takes for the setup times since they come pre-assembled. They also often arrive on site ready to work with little more than counterweight adjustment and boom extension. For instance, a 100-ton truck crane can often be operational in 20 minutes. A large crawler crane such as a 600-ton will take an hour to assemble the tracks and center itself for operation. In a survey undertaken by Construction Weekly in the year 2021, 65% of the contractors preferred the use of truck cranes since they are faster when there is not enough time, mobilization and setup take lesser time. However, site conditions could affect set-up time. Crawlers are built for difficult site conditions and hence take more set-up time for stability and track leveling. For example, if the job site has muddy or uneven ground, then additional preparation-such as ground mats or extra support equipment-will be necessary for the crawler crane. This could take up to 50% more time to set up; meanwhile, a truck crane is able to go directly onto flat surfaces with little to no preparation, thus having much quicker setup times. For example, in an offshore oil platform construction project, it was reported that a crawler crane took up to 5 more hours to set up on the difficult ground, while the truck crane operating on a relatively firm ground only required 1 hour.

From a cost viewpoint, the longer setup time of crawler cranes is also more expensive. Daily rental rates for crawler cranes range from $2,000 to $4,000 depending on the model and duration, while a truck crane would be only $1,500 to $3,000 per day. The additional setup time required with crawler cranes raises costs associated with both labor and downtime. In a 2022 Florida highway expansion, the overall cost of setup delays for crawler cranes resulted in an extra $15,000 in labor costs alone, with the truck cranes adding value by 15% less in setup-related downtime.

Of course, there's a big difference in setup time when it concerns how long the cranes will be on a project. Projects that do not require the crane to be moved site to site and where it will remain in one location for several days or weeks make the initial setup time less important. In a Texas wind turbine installation, the approximately 90 minute set up time longer on the crawler crane was not an issue as the crane stayed on the site for several weeks. The inconvenience of the longer setup time in this case was offset by the stability provided by the crawler crane. Crawler cranes are preferred for long-term, heavy-duty projects since, over time, they offer greater safety and lifting capacity.

Terrain Limitations

Whenever one talks of limitation to terrain, the type of crane selected can make or break a project, especially in those really difficult or unpredictable environments. The truck cranes, while designed to be mobile and flexible, do have some limitations in navigating challenging terrains. For example, while a truck crane might have a top speed of 60 mph on a hard-surfaced road, it is very often restricted to flat, firm surfaces, such as highways or well-prepared construction sites. This is explained by the fact that the crane is built on a conventional truck chassis, and its wheeled design makes it vulnerable on soft, uneven, or muddy ground. For instance, in some cases, a 100-ton truck crane located in one of Louisiana's flood areas was only able to lift with 15% efficiency compared to a similar crane situated on hard ground. This is because the weight is distributed less optimally, increasing the risk of sinking or instability on softer soils.

The main difference, though, is that crawler cranes are specially made for working through irregular and heavy ground conditions, while the wide track provides much more surface for distributing the weight of the crane evenly and therefore the capability of giving performance over many kinds of poor terrain. With only 0.18 kg/cm² of ground pressure, a 500-ton crawler crane is able to be deployed in wet, muddy, or soft soil, thus being stable enough for less-than-ideal situations. This is very important when it comes to an offshore project or large infrastructure projects in the mountains or in a quarry, where solid grounds are not commonly available. For example, in a 200-meter deep mine in Nevada, the crawler crane demonstrated its ability to lift components weighing over 300 tons with remarkable precision, while a truck crane would have been unable to operate efficiently without additional support equipment like ground mats.

The weight capacity of a crawler crane is also heavily influenced by the terrain it’s operating on. On hard, compacted ground, or even on rocky surfaces, the crane can normally operate at near its maximum lifting capacity. On softer or swampy conditions, however, even a large crawler crane's lifting capacity could be reduced as much as 30 percent. In the case of the hydroelectric dam project in Chile, a crawler crane had to be fitted out with additional counterweights, and even then, its load capacity was reduced from 600 tons down to 420 tons because of unstable ground conditions. Such a case is a good illustration of how terrain can determine a crane's performance when the weight of a project is considerable.

Another very important aspect is the crane's mobility in different types of terrain. While truck cranes are ideal to travel long distances from one job site to another on hard-paved roads, their access in rough terrains is rather limited. Thus, while a truck crane can travel as much as 200 miles a day on highways, it could only struggle to the remote areas of a construction zone in snow, mud, or steep inclines. For example, one roadwork project in Colorado required a truck crane to be moved over mountain passes where the crane had to slow down to 15 miles an hour because of steep grades; this increased the travel time by 40%. While crawler cranes are slow to transport overall-usually only 1-2 mph across difficult ground-once on a site they possess unparalleled mobility in hilly, rough, unprepared terrain. And the limitations of terrain have real cost implications as well. Whereas a 500-ton truck crane might be rented for $2,000 to $3,500 per day, that amount is multiplied many times over when extra transport and preparation over difficult terrain are considered. For example, specialty transport devices needed for a truck crane crossing rough roads or rocky hills may raise the project cost by as much as 20%, adding an extra $5,000 to $8,000 per move. In comparison, though the crawler crane may have rental fees at $3,000 to $5,000 per day, besides eliminating any special ground preparation, mats, or extra over-and-above transportation costs, is more viable in the long projects that involve heavy terrain-such as mining or infrastructure development in forests.